Preventive Maintenance Plan Based on the Criticality of Biomedical Teams Sánchez Ferrer Clinic, to increase the Reliability

Authors

  • Jerry Raúl Zegarra Tanchiva Universidad César Vallejo, Trujillo, Perú

Keywords:

Biomedical equipment, Realiability, Availability, Maintainability, Criticality analysis

Abstract

This investigation, was based on the maintenance of biomedical equipment, of the clinical Sánchez Ferrer -Trujillo, with a total sample of 173 teams, grouped in 52 biomedical equipment. The aim of this investigation was to increase the reliability by evaluating a criticality analysis. They were evaluated current conditions of maintenance management indicators such a reliability, availability and maintainability, obtaining: 85.05%, 94.03% and 19.15% respectively. It was obtaining a total of 19 biomedical equipment with low maintenance indicators. The criticality analysis was conducted at 52 biomedical equipment, getting 20 critical equipment, 6 semi-critical teams and 26 not critical teams. This evaluation was performed by weighting 6 criteria: frequency of failures, impact on production, maintenance impact, impact on the maintenance staff, impact on patients and environmental impact. It was made a preventive maintenance plan for each critical biomedical equipment, obtaining an increase in maintenance indicators: 90.52% of reliability, 97.98% of availability and 33.07% of maintainability.

Published

2016-12-30

How to Cite

Zegarra Tanchiva, J. R. (2016). Preventive Maintenance Plan Based on the Criticality of Biomedical Teams Sánchez Ferrer Clinic, to increase the Reliability. Innovación En Ingeniería, 2(1). Retrieved from https://revistas.ucv.edu.pe/index.php/innovacion/article/view/1750

Issue

Section

Mechanical and Electrical Engineering