Study of replacement of turbines to back pressure by electric motors in the grinding area to improve the cogeneration of electric power of the company Caña Brava
DOI:
https://doi.org/10.18050/td.v15i1.1871Keywords:
Cogeneration, Efficiency, Induction, Thermoelectric plant, VariatorAbstract
In this project, it was determined the study of back pressure turbine replacement by electric motors of induction for the use of electrical energy in the company Cana Brava. A mass balance and energy to determine the efficiency of the current thermoelectric plant and boiler. We calculated the new network of pipes in improvement for the steam supply to the turbine backpressure, modeled refiective the electric generators and electrical conductors in medium voltage for the transport of energy to the transformer, which was also sizing and selected. Is modeled refiective the squirrel cage electric motors, variable speed drives for better controllability of the Mills and grinders and electrical conductors in low voltage. The increase in the efficiency of boiler is of 8.08% and 3.78% of the thermoelectric plant in terms of improvement. The electric energy surplus for sale to the SEIN is 1.45MW, earning an annual income of 2133936 N.S./year, if the preferential price through Osinergmin is 60 $/MWh.The returns period of the investment is 0.33 years, a rate of 15% obtaining a NPV equal to $ 10343191 and a IRR of 304%.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2017 Tecnología & Desarrollo
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.