[1]
Echevarría Sánchez, G. et al. 2015. Design of a Plan of Reliability Centered Maintenance (RCM), to increase the Operational Availability of Critical Equipment Area Frozen Fish Complex Casamar SAC. Chimbote, 2015.
INGnosis. 1, 1 (Dec. 2015), 184–191. DOI:
https://doi.org/10.18050/ingnosis.v1i1.1961.